Forum latest

  • Long time no talk
    We've all pretty much moved in to the new house here: https://www.gamersonlinux.com/f...
  • Long time no talk
    Not too many old timers still posting here. It's great to see you on the board, I hop...
  • Long time no talk
    Doing great. Sorry long time response. How is everyone holding up on here?
Guide: Adding Extra Run-Time to Your UPS - Build the Battery Pack - The Wiring Harness
Hardware
Written by Gizmo   
Monday, 30 January 2006 00:00
Article Index
Guide: Adding Extra Run-Time to Your UPS
The Operation
The Operation - Removing the Face-Plate
The Operation - Removing the Battery
The Operation - Opening It Up
The Operation - Exposed Wiring
The Operation - Changing Connectors
The Operation - Splicing
First Smoke Test
Build the Battery Pack
Build the Battery Pack - The Wiring Harness
Second Smoke Test
Reassembly and Final Configuration
Reassembly and Final Configuration - Calibration
Reassembly and Final Configuration - All Done
All Pages

At this point, go back to your battery assembly. Attach the red wire from your wiring harness to the posive ('+') terminal of your battery pack, and attach the black wire from your wiring harness to the negative ('-') terminal of your battery pack. When you get done, the assembly should look like so:

 



 
Don't Click Here Don't Click Here Either